Project 106 (Donation Cost $11,630) in Dorjdasht Village (35 families) in Bartang Valley, Rushan District, GBAO Region, Install a new irrigation system which requires 200 meters of open ditch and 1800 meters of pipeline to irrigate new farm lands.

Project 106 (Donation Cost $11,630) in Dorjdasht Village (35 families) in Bartang Valley, Rushan District, GBAO Region, Install a new irrigation system which requires 200 meters of open ditch and 1800 meters of pipeline to irrigate new farm lands.

 << Overview<< Projects under Construction<< Projects under planning To be funded by: DhananisDorjdasht VillagePre-project Situation The households of the village are currently lacking cultivable land. There is 4.5 Ha of land currently available in...

read more
Project 55, Donation. Cost: US$28,800 – Excavating a 3m diameter well, minimum 8m deep, installation of 2 water pumps and a pipeline to provide Shurkhok village with 180 Households (in DURA) 3.5 km away access to clean Drinking Water                                                 access to safe drinking water from a well 3.5 km away.

Project 55, Donation. Cost: US$28,800 – Excavating a 3m diameter well, minimum 8m deep, installation of 2 water pumps and a pipeline to provide Shurkhok village with 180 Households (in DURA) 3.5 km away access to clean Drinking Water access to safe drinking water from a well 3.5 km away.

 << Overview<< Projects under Construction<< Projects under planning Funded by: DhananisShurkhok Village (400 years old)  Pre-project SituationThe 180 households of Shurkhok village face a critical challenge in accessing safe water. At present,...

read more
Project 38 (Estimated Cost $17,890) in 500 years old Sezhd Vllage (45 families) in Roshqala district: install a new irrigation system to irrigate new farmland in Sezhd Village and nearby 300 years old Tabarsem village (26 families)

Project 38 (Estimated Cost $17,890) in 500 years old Sezhd Vllage (45 families) in Roshqala district: install a new irrigation system to irrigate new farmland in Sezhd Village and nearby 300 years old Tabarsem village (26 families)

 << Overview<< Projects under Construction<< Projects under planning To be funded by: DhananisSezhd VillageTabarsem VillagePre-project Situation  Currently, 11 Ha of land, which is very scares in GBAO region and especially Roshtqala district, is not...

read more