Project 110, Donation. Cost: US$14,500 – Installation of a pipeline to provide Ravmed village with 38 Households, in Rushan District, GBAO Region, access to safe drinking water from a mountain spring located 5.5 kms away.
<< Overview<< Projects UnderwayFunded by: DhananisRavmed VillagePre-project SituationThe 38 household in Ravmed village currently are using the water from the Bartang river as a source of the drinking water which is located 1.5 kms away from the...
Project 103, Donated cost: US$13,800 – Installation of a pipeline to provide Budun village, 35 families, Vanj District, GBAO Region, access to safe drinking water from spring source, 5750 meters up a mountain.
<< Overview<< Projects Underway Funded by: DhananisBudun VillagePre-project SituationThe 35 household that reside in the Budun village currently are using the water from the river as a source of the drinking water. The water in the river is not safe, as...