Projects Under Construction
Project 110, Donation. Cost: US$14,500 – Installation of a pipeline to provide Ravmed village with 38 Households, in Rushan District, access to safe drinking water from a mountain spring located 5.5 kms away.
<< Overview<< Projects UnderwayFunded by: DhananisRavmed VillagePre-project SituationThe 38 household in Ravmed village currently are using the water from the Bartang river as a source of the drinking water which is located 1.5 kms away from the...
Project 109, Donation. Cost: US$16,000 – Installation of a pipeline to provide Imomashrab village with 45 Households, District Panj , access to safe drinking water from a big Well located 4 kms away.
<< Overview<< Projects UnderwayFunded by: DhananisImomashrab VillagePre-project SituationCurrently the residents of Imomashrab village suffer from difficult access to drinking water. The residents fetch water from the water source which is located 3 kms...
Project 108, Donated Cost: US$15,700 – Installation of a pipeline to provide Yamchun Village, 45 Households, Ishkashim District, access to safe drinking water from a mountain spring located 7.5 kms away
<< Overview<< Projects UnderwayFunded by: DhananisYamchun VillagePre-project SituationThe village does not have access to clean drinkingwater. Right now they are using water from Ishkahim river, which is not very safe and causes various infectious...
Project 103, Donated cost: US$13,800 – Installation of a pipeline to provide Budun village, 35 families, Vanj District, access to safe drinking water from spring source, 5750 meters up a mountain.
<< Overview<< Projects Underway Funded by: DhananisBudun VillagePre-project SituationThe 35 household that reside in the Budun village currently are using the water from the river as a source of the drinking water. The water in the river is not safe, as...