Projects Under planning
Project 113, Donation. Cost: US$15,600 – Installation of a pipeline to provide Rubot village, with 28 Households, in Roshqala district,GBAO, access to safe drinking water from a mountain spring located 5.5 kms away.
<< Overview<< Projects UnderwayFunded by: DhananisRubot VillagePre-project SituationThe 28 household in Rubot village currently are using the water from the Roshqala river as a source of the drinking water which is located 1.2 kms away from the...
Project 112, Donation. Cost: US$17,400 – Installation of a pipeline to provide Vanvanibolo village with 46 Households, in Vanj district, GBAO access to safe drinking water from a mountain spring located 7.5 kms away.
<< Overview<< Projects UnderwayFunded by: DhananisVanvanibolo VillagePre-project SituationThe 46 household in Vanvanibolo village currently are using the water from the Vanj river as a source of the drinking water which is located 1.7 kms away from the...
Project 111, Donation. Cost: US$18,700 – Installation of a pipeline to provide Devdor village with 126 Households, in Khatlon Region, Shurobo District, access to safe drinking water from a mountain spring located 7.8 kms away.
<< Overview<< Projects UnderwayFunded by: DhananisDevdor VillagePre-project SituationThe 120 household in Devdor village currently are using the water from the small channel as a source of the drinking water which is located 2 kms away from the...