Installed new Irrigation Systems or Repaired existing irrigation systems to enable villages in GBAO Region to farm aditional arable lands, or to improve the productivity of their existing farms.
Project 85 Donated cost: US$9,400 – Installation of a water pump for irrigation, in Jaranjan village of 35 families, Roshqala district.
<< Overview<< Completed Irrigation Projects Funded by Dhananis and Gillanis Mithoo and Nabat Gillani (residing in Cagary, Canada) contributed US$2,500 to participate in the Project.Jaranjan VillagePre-project Situation To irrigate the land in the...
Project 53 (Donated cost US$4750): Installed a Water Wheel in Ajirsh Village ( 24 families) in Bartang Valley, Rushan District, to irrigate a new farmland with water from the bordering river
<< Overview<< Completed Irrigation Projects Funding: Mithoo and Nabat of Calgay voluntarily contributed US$3,500Ajirsh Village Pre-Project SituationThere is 4 ha of unused arable land. It has good quality of soil and can be used for increasing the...
Project 45 (Donated Cost $10,630) in Mazanchut Vllage (10 families) in Bartang Valley, Rushan District: installed a new irrigation system which required 150 meters of open ditch and 470 meters of pipeline to irrigate new farm lands in Mazanchut and Bardara Village of 70 families
<< Overview<< Completed Irrigation Projects Funded by: Dhananis and Gillanis Mithoo and Nabat Gillani (residing in Calgary, Canada) contributed US$2,500 to participate in the ProjectMazanchut villageBardara VillageProject ScopeInstallation of a 470 meter...
Project 33, Donation cost US$ 5967. Installation of 252-meter long pipe in Ravmed, Bartang Valley, Roshan District, to bypass a channel length that collapses during the heavy snowfall.
<< Overview<< Completed Irrigation Projects Funding Mithoo and Nabat Gillani (residing in Cagary, Canada) contributed US$2,000 towards the total cost of this project..Ravmed Village with 65 families in the PamirsPre-Project Situation Long ago, the...
Project 21: Cost US$9795. In Razuj, Rushan District, UBB restored the water channel for irrigation
<< Overview<< Completed Irrigation Projects Sponsors: DhananisVillage of Razuj with 55 familiesPre-project situation For this village, farming is their main source of income. They farm in a valley 8 kms away. They used to have plenty of water for...
Project 18: Donation Cost US$7500. In Chadud, Rushan District, UBBdonated pipe materials to install a pipeline to bypass a channel section that every year collapsed in winter due to heavy snow fall.
<< Overview<< Completed Irrigation Projects Funding by: DhananisVillage of Chadud with 15 familiesPre-project situation The village receives river water for irrigation via 1600-meter long open channel that was built a long time ago by the village....