Installed/Built new Irrigation Systems to enable villages to farm their otherwise unused arable lands or Repair existing Irrigation Systems: to improve the productivity of the farms
Project 85 Donated cost: US$9,400 – Installation of a water pump for irrigation, in Jaranjan village of 35 families, Roshqala district.
<< Overview<< Completed Irrigation Projects Funded by Dhananis and Gillanis Mithoo and Nabat Gillani (residing in Cagary, Canada) contributed US$2,500 to participate in the Project.Jaranjan VillagePre-project Situation To irrigate the land in the...
Project 53 (Donated cost US$4750): Installed a Water Wheel in Ajirsh Village ( 24 families) in Bartang Valley, Rushan District, to irrigate a new farmland with water from the bordering river
<< Overview<< Completed Irrigation Projects Funding: Mithoo and Nabat of Calgay voluntarily contributed US$3,500Ajirsh Village Pre-Project SituationThere is 4 ha of unused arable land. It has good quality of soil and can be used for increasing the...
Project 45 (Donated Cost $10,630) in Mazanchut Vllage (10 families) in Bartang Valley, Rushan District: installed a new irrigation system which required 150 meters of open ditch and 470 meters of pipeline to irrigate new farm lands in Mazanchut and Bardara Village of 70 families
<< Overview<< Completed Irrigation Projects Funded by: Dhananis and Gillanis Mithoo and Nabat Gillani (residing in Calgary, Canada) contributed US$2,500 to participate in the ProjectMazanchut villageBardara VillageProject ScopeInstallation of a 470 meter...
Project 33, Donation cost US$ 5967. Installation of 252-meter long pipe in Ravmed, Bartang Valley, Roshan District, to bypass a channel length that collapses during the heavy snowfall.
<< Overview<< Completed Irrigation Projects Funding Mithoo and Nabat Gillani (residing in Cagary, Canada) contributed US$2,000 towards the total cost of this project..Ravmed Village with 65 families in the PamirsPre-Project Situation Long ago, the...
Project 21: Cost US$9795. In Razuj, Rushan District, UBB restored the water channel for irrigation
<< Overview<< Completed Irrigation Projects Sponsors: DhananisVillage of Razuj with 55 familiesPre-project situation For this village, farming is their main source of income. They farm in a valley 8 kms away. They used to have plenty of water for...
Project 18: Donation Cost US$7500. In Chadud, Rushan District, UBBdonated pipe materials to install a pipeline to bypass a channel section that every year collapsed in winter due to heavy snow fall.
<< Overview<< Completed Irrigation Projects Funding by: DhananisVillage of Chadud with 15 familiesPre-project situation The village receives river water for irrigation via 1600-meter long open channel that was built a long time ago by the village....