Select Page

Project 101, Cost: US$8,450 – Installation of a pipeline to provide Dashtishavd village, 18 families, Vanj District, access to safe drinking water from spring source, 3900 meters up a mountain.

Joint Funding:  

Dhananis funded US$5,450 and Mithooo and Nabat Gillani from Calgary voluntarily funded US$3,000.

Dashtishavd Village

Pre-project Situation

In summer:

Water from the river is used for drinking purposes. The water in the river is not suitable for drinking. During the summer the water is highly used for washing also, which leaves stains on the clothes and very hard for the skin to be used.

In winter:

Due to the cold weather some points of the river freeze. Due to this the fetching location becomes farther as  only some points for fetching water are available.

 

 

 

Yazgulam River

Project Scope

Installation of  a 63 mm diameter    polyethylene pipeline from the spring source, 3.9 km away from the village

Path of the pipeline

                              The spring Source

Expected benefits

This piped access to potable water will benefit them in 5 different ways:

1) The villagers will not suffer from waterborne diseases

2) It will free up more time to work on their farmland during spring, summer, and fall

3) every day, they will have more time to cook meals

4) in winter, it will give the parents more time to spend with the
kids on doing their homework, and

5) Kids will have more time to study and do other activities

Items donated 

Construction/Installation  by the Village 

Completed project (Completed in October, 2022 but photos pending)

 

Feedback from the village (pending)